Last Updated: 20 November 2026
Quick Summary
A kitchen renovation usually takes four to six weeks for a like-for-like replacement, split into planning and design, lead time for cabinets and worktops, and one to three weeks of on-site fitting. A full renovation with a layout change typically takes ten to sixteen weeks.
- Planning and design takes two to four weeks, while fitting a straightforward replacement takes one to three weeks.
- A cosmetic refresh of doors and worktops only typically takes two to three working days on site.
- Late deliveries are the biggest single cause of delay, so confirm lead times in writing.
- Hold a contingency of one to two weeks in your schedule.
- Changing layout or finishes after units are ordered is the most expensive delay of all.
Table of Contents
- A phase-by-phase kitchen renovation timeline
- How long does it take to fit a kitchen?
- What causes kitchen renovation delays?
- Your kitchen renovation checklist for staying on schedule
A phase-by-phase kitchen renovation timeline
Most homeowners asking how long a kitchen renovation takes get one number and no context. It splits into three phases, only one of which happens on site: planning and design (two to four weeks), ordering cabinets and worktops (several weeks of lead time), and fitting (one to three weeks for a straightforward replacement).
At Animanimus, we plan every project around that split, because the waiting is where schedules quietly slip.

Ask any contractor for their schedule in those three parts. A single total figure hides where the time goes.
How long does it take to fit a kitchen?
How long fitting takes depends on the scope of the work. A standard replacement is typically quicker than a project that changes the layout and involves building work, and the timing assumes units, worktops and appliances are on site before fitting begins.
Scope drives everything. A like-for-like swap is fast. Moving a sink, adding a gas hob in a new position or knocking through a wall pulls in extra trades and inspections, stretching the schedule.
| Project scope | Planning and design | On-site fitting | Typical total |
|---|---|---|---|
| Cosmetic refresh, doors and worktops only | 1 week | 2-4 working days | 2-3 weeks |
| Like-for-like kitchen replacement | 1-2 weeks | 1-2 weeks | 4-6 weeks |
| Replacement with new appliances and tiling | 2-3 weeks | 2-3 weeks | 6-9 weeks |
| Full renovation with layout change | 3-4 weeks | 4-8 weeks | 10-16 weeks |
Typical total
If you want to see what a managed kitchen installation involves from design through to the final fit, our kitchen renovations in London page sets out the full service. When you are ready to talk through your own space, you can contact Animanimus with your project details.
What causes kitchen renovation delays?
Delays come from four places: late deliveries, hidden problems behind the old units, trades booked out of sequence, and changes made after work starts. Most can be reduced with better planning.
Late deliveries are the biggest single cause. Worktops are often templated only after cabinets are fitted, so a stone worktop can add a week or two mid-project. Order early and confirm dates in writing.
Hidden problems are the wildcard. Damp behind units, outdated wiring or an uneven floor can add days once the rip-out exposes them. A survey before work begins reduces the surprise.
Sequencing errors cost time too: plumbers, electricians, plasterers and tilers must follow each other in the right order. Animanimus keeps every stage in-house rather than splitting work between contractors, so one team coordinates the whole job.
Watch out: changing your mind on layout or finishes after units are ordered is the most expensive delay of all, because it can mean re-ordering and re-booking every trade behind it.
Your kitchen renovation checklist for staying on schedule
A realistic schedule comes from a checklist you work through before anyone lifts a tool.
- Confirm the layout and finalise measurements
- Choose units, worktops and appliances and confirm lead times in writing
- Book the survey and flag any suspected wiring, plumbing or damp issues
- Agree the trade sequence and start date with your contractor
- Set up a temporary kitchen with a kettle, microwave and fridge
- Clear the room and protect adjoining floors and doorways
- Agree a snagging walk-through date before work begins
- Hold a contingency of one to two weeks in your schedule
Two more steps save real stress. Check reviews and look at photos and videos of past projects before you hire, and ask how the household will keep functioning while the work runs. For a fuller walkthrough, see our guides to planning a kitchen renovation without the stress, how to pick a kitchen renovation company and what to consider before planning a kitchen renovation.
The realistic answer to how long a kitchen renovation takes is that the calendar is set before the first unit comes off the wall. Get planning, ordering and sequencing right and the fitting phase stays short. At Animanimus, our in-house team manages every stage from design to install, so you have one point of contact and no gaps between trades. We handle kitchens, bathrooms and full property refurbishment as a single job, and we do not subcontract the work. Get started with Animanimus and book a renovation that finishes when we say it will.